48 Test


Stringent checks are performed on any installation before it is handed over to a client.

At D2E International we operate with a comprehensive list of operational specifications that must be met before completion. These test-run checks on all functions are carried out over a 48 hour period of lift examination during which the lift is run continually to test for any issues.